Portland City Grill:
19,520 sq. ft. This project included the reconfiguration of an existing
chilled water VAV system, adding 31 VAV boxes with electric reheat
and upgrading the existing pneumatic control system to a Siemens electronic
DDC system. Additionally, we added seven Type I kitchen hoods connected
to a central Type I welded exhaust duct/fan system, a welded stainless
steel dishwasher exhaust system and a central make-up air system.
|